Skip to content

baseDeployObject

Controls resource deployment to the base location at the end of a work shift. Spiral estimates the deployment timing when no additional stops remain and travel duration plus time exceeds the scheduled end time.

{
"mode": ALWAYS | NEVER | LATE | AUTO_HEAD | AUTO_ARV,
}
mode ALWAYS | NEVER | LATE | AUTO_HEAD | AUTO_ARV default ALWAYS
Action at deployment time: ALWAYS (issue DPLY), NEVER (no action), LATE (as ALWAYS for a roster sign-off stop), AUTO_HEAD (issue HEAD), AUTO_ARV (issue ARV).
time timeInterval
Positive or negative adjustment to travel duration when calculating the deployment time.